Berga Suspended Pedestrian Footbridge Project Slide Show Ethiopia Sponsors: Helvetas provided the technical support, the Berga Wereda provided the labor and materials, and the Oromia Rural Roads Authority and Bridges to Prosperity provided the cable. River: Berga Population Served by Bridge: 20,000 Bridge Name: Berga Suspended Bridge Bridge Span: 36 meter span (118 feet) Pedestrian Footbridge Type: Suspended Bridge Completion Date: August 2006 Bridge Story: This bridge was started and finished in just one month! The Oromia Rural Roads Authority Engineer was fully trained on this bridge by Helvetas. Click on the Google Earth™ logo-Project link below to see a satellite view of the bridge site. Get a free copy of Google Earth™ here. |
|
|
||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||